|
|
ABNQ09GL1A2 OWNER’S MANUALAIRCONDITIONERwww.lg.comPlease read this manual carefully before operating your set and retain it for future reference.CEILING CONCEALED DUCTOriginal instructionCopyright © 2018 LG Electronics Inc. All Rights Reserved.ENGLISHTiếng ViệtBAHASA INDONESIARev. : 00(11T18)*MFL67798206 ...
ABNQ09GL1A2, 108
FFRE0833S1 READ BEFORE INSTALLING UNITMSII MSIII Window Mounting (5,000~8,000 BTU)1Installation InstructionsBefore installing, the top rail must be assembled on the unit.DO NOT USE ANY SCREWS OTHER THANTHOSE SPECIFIED HERE.NOTE:SAVE CARTON and these INSTALLATIONINSTRUCTIONS for future reference. The carton ist ...
FFRE0833S1, 5
AKQ12AN Note: When installing slide-out chassis units in through-the-wall applications, keep louvers free. Do not restrict air flow areas. Fixed chassis units are not suitable for through-the-wall applications.Wall Outlets: All wiring including installation of receptacle must be made in accordance with loc ...
AKQ12AN, 2
High Capacity Room Air Conditioner IntroductionAmana High Capacity Room Air Conditioners can beinstalled through a wall or in a window. Windowinstallations require an Instant Mount Mounting Kit (modelnumber RAWK2). Window mounting kits are available at(or through) Authorized Amana Dealers.This instruction sheet provides guidelines fo ...
High Capacity Room Air Conditioner, 2
# | Brand | Model | Document (PDF) | Pages | Size | Check Date |
---|---|---|---|---|---|---|
1 | GE | Carry-Cool AT505 |
8 | 19.10.2023 | ||
2 | Cool Automation | CoolMasterNet |
24 | 25.10.2023 | ||
3 | Whirlpool | ACP102PR2 |
40 | 18.01.2024 | ||
4 | Mitsubishi | FDCVA302HENR |
199 | 04.03.2024 | ||
5 | dirna Bergstrom | bycool green line COMPACT 3.0 |
60 | 20.03.2024 | ||
6 | Hitachi | RAS-07CH5 |
52 | 13.09.2023 | ||
7 | Toshiba | RAV-362BH-PE |
20 | 30.12.2023 | ||
8 | Daikin | Comfora FTXP20~71L2V1B |
68 | 23.11.2023 | ||
9 | Carrier | 38BNB |
36 | 2.03 Mb | 31.12.2023 | |
10 | LG | LP073HD3A |
25 | 11.10.2023 |